Tile In-Bedding Gallery

compacted screed

1. With 200mm compacted screed to falls

Segmented Planning

2. Segment planning for straight lines with falls

Compacted 200mm Screed

3. Compacted 200mm screed in-bedding

Floor levels settings

4. All floor levels set with dumpy level to falls

Site quality control

5. Site quality control by owner and managers

Site setup area

6. Site setup and containment area

Site setup area

7. Site management and layout

In-bedding process

8. In-bedding process

In-bedding

9. In-bedding

In-bedding

10. In-bedding

Tile connection joints

11. Tile connection joints inspection

Bunded Wall

12. Bunded wall with 45 degree skirting

Floor sections split levels

13. Floor section with split levels

Bunded skirting

14. 45 Degree bunded skirting

45 Degree narrow width

15. 45 Degree with narrow width

Completed floor section

16. Completed floor section

Completed floor

17. Completed floor

Completed Floor

18. Completed floor

Floor set to floors 1:100

19. Floor set to floors 1:100

Fall to floor 200>70

20. Fall to floor 200>70

Segmented floors hi/lo points

21. Segmented floors hi/lo points

Skirting 45mitre to wall & floor

22. Skirting 45mitre to wall & floor

Drain detail

23. Drain detail

24. Column detail

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

Erode Epoxy grout & tile damage

1. Eroded Epoxy grout & tile damage

Damaged floor section tiled with tile glue

2. Damaged floor section tiled with tile glue

Acid damaged epoxy grout erode screed

3. Acid damaged epoxy grout erode screed

Tile repairs done with incorrect inbedding tile glue

4. Tile repairs done with incorrect inbedding tile glue

Incorrect inbedding tile glue

5. Incorrect inbedding tile glue

Eroded tile Epoxy glue

6. Eroded tile Epoxy glue

New tile repair ready to receive Epoxy grout

7. New tile repair ready to receive Epoxy grout

Drain layout patern

8. Drain layout patern

Floor drain with tile repair

9. Floor drain with tile repair

Pointing-epoxy-grout-to-tile-connections

10. Pointing-epoxy-grout-to-tile-connections

Clean floor before and after

11. Clean floor before and after

Clean floor grinding

12. Clean floor flexipad carbon and diamond grind

Cleaned floor

13. Cleaned floor

Floor tile to tanks in floor

14. Floor tile to tanks in floor

New site Clover Gaborone

1. New site Clover Gaborone

New floor installation tile inbedding to falls Clover Botswana

2. New floor installation tile inbedding to falls Clover Botswana

Work in progress tile inbedding process

3. Work in progress tile inbedding process

Work in progress Clover Gaborone

4. Work in progress Clover Gaborone

Substrate clean and prepared for floor construction

5. Substrate clean and prepared for floor construction

Completed floor to fall

6. Completed floor to fall

Completed floor to fall

7. Completed floor to fall

Wall tile with gail

8. Wall tile with gail

Completed floor section segmented floor section to falls Clover Gaborone

9. Completed floor section segmented floor section to falls Clover Gaborone

Setting band to fall floor construction

1. Setting band to fall floor construction

Falls 1 to 100 from 40mm to 220mm

2. Falls 1 to 100 from 40mm to 220mm

Falls to floor

3. Falls to floor

Floor system construction

4. Floor system construction

Floor set to falls to open drain channel

5. Floor set to falls to open drain channel

Floor tile inbedding process to falls to drain point

6. Floor tile inbedding process to falls to drain point

Open channel drain - tile detail

7. Open channel drain - tile detail

Tile detail

8. Tile detail

Tile detail

9. Tile detail

Open drain channel installation and floor tiling

10. Open drain channel installation and floor tiling

Rodding eye installation to stainless steel drain pipe

11. Rodding eye installation to stainless steel drain pipe

Tiled floor drain mitre detail

12. Tiled floor drain mitre detail

Skirting tile detail connecting floor and wall

13. Skirting tile detail connecting floor and wall

Single column base skirting detail

14. Single column base skirting detail

Pillar base skirting datail

15. Pillar base skirting datail

Segmented floor section 1 in 100 fall

16. Segmented floor section 1 in 100 fall

Floor divided into two halves with high point in the middle fall to drain

17. Floor divided into two halves with high point in the middle fall to drain

Completed floor all drains skirting

18. Completed floor all drains skirting

Fully constructed floor

19. Fully constructed floor

Wall tile detail to door frame and dado tile

20. Wall tile detail to door frame and dado tile

Wall tile detail lines and spacing

21. Wall tile detail lines and spacing

Detail to floor and wall tile with skirting

22. Detail to floor and wall tile with skirting

Floor drain repairs to existing mez levels

23. Floor drain repairs to existing mez levels

Removal and Replacement of floor drain

24. Removal and Replacement of floor drain

Replacement of drain setting with prostruc 522 repair mortar

25. Replacement of drain setting with prostruc 522 repair mortar

Completed drain detail after repair

26. Completed drain detail after repair

Waterpfoofing to tiled floor on mezanine levels

1. Waterpfoofing to tiled floor on mezanine levels